QEHSQEHS

compliance

Process Safety Management — 29 CFR 1910.119

The 14 PSM elements mapped to QEHS modules. Applicable to highly hazardous chemical processes above the threshold quantities listed in Appendix A.

15 min read · 2 sections

Overview

OSHA 29 CFR 1910.119 requires a written PSM programme for facilities with quantities of highly hazardous chemicals at or above the thresholds in Appendix A. Similar EPA rules (40 CFR 68 RMP) apply for off-site risk.

The 14 elements

Element1910.119 (d)–(o)QEHS module
Employee participation(c)Consultation module
Process safety information (PSI)(d)Documents + Chemicals library
Process hazard analysis (PHA)(e)PHA module
Operating procedures(f)Documents / Procedures
Training(g)Training module
Contractors(h)Contractors module
Pre-startup safety review(i)PSSR module
Mechanical integrity(j)Assets + Inspections
Hot work permit(k)Permits module
Management of change(l)MOC module
Incident investigation(m)Incidents + Root cause
Emergency planning and response(n)Emergency drills module
Compliance audits(o)Audits module — PSM programme
Trade secrets(p)Documents — access-controlled
Tags: psm · 1910.119 · process-safety · us